What Happens During a Roof Replacement, Step by Step

Short answer: a roof replacement is loud, busy, and more orderly than most homeowners expect. The old roof comes off, the deck underneath gets inspected board by board, the new system goes on in layers, and the yard gets cleaned like we were never there. Here's the order it happens in, so there are no surprises on the day.

Before anybody climbs a ladder

It starts with the inspection and the estimate, not the tear-off. We get on the roof, check the attic side too, measure everything, and take photos so you can see what we're seeing. Then you get a flat-rate estimate — the price we quote is the price, not a starting point.

Once you say go, we help you pick the material: architectural shingles like GAF Timberline HDZ, standing seam or exposed-fastener metal, or a flat roofing system (TPO, PVC, or modified bitumen) if your roof calls for it. Materials and a dump trailer get scheduled for delivery, and we talk through the practical stuff — where the trailer sits, what to move off the patio, and keeping kids and pets inside while the work is going on.

Step 1: Tear-off

The crew strips the old roof down to the wood deck — shingles, old underlayment, all of it. This is the loud part, and there's no way around that. It's also the most important part of the whole job, because you can't honestly judge a roof until you can see what's under it.

Some companies will offer to roof right over your old shingles. We don't recommend it, and this step is why: a layer-over hides the deck, and the deck is where the real problems live.

Step 2: The deck inspection

With the old roof off, every board of decking gets a look. Soft spots, rot from a slow leak that never showed inside, delaminated plywood — it all shows itself now. Bad sections get replaced before anything new goes on.

This is the step that separates a roof that lasts from a roof that just looks new. New shingles over rotten decking will fail early no matter how good the shingles are. If we find deck damage, we show you the photos and tell you straight what it takes to fix it. No surprises buried under your new roof.

Step 3: The new system goes on, in layers

A roof is a system, not just shingles. First comes the protective underlayment over the deck, with extra waterproof protection in the spots that need it most — the eaves, the valleys, and around penetrations. Then drip edge and flashing, the metal pieces that steer water where it belongs and keep it out of the seams around chimneys, vents, and pipe boots.

Only then does the roofing itself go on, installed to the manufacturer's specs — that matters, because a roof installed wrong can void the very warranty you paid for. Ridge venting goes on at the top so the attic can breathe, which protects the new roof from underneath as much as the weather attacks it from above.

Step 4: Cleanup and the magnet sweep

When the last shingle is on, the job isn't done — the yard matters too. Debris goes in the trailer, and we run a magnetic sweep across the yard, driveway, and flower beds to pick up stray nails. Then we run it again. A homeowner should never find our leftovers with a bare foot or a tire.

Step 5: The final walkthrough

We walk the finished roof and then we walk it with you — photos of the completed work, the deck repairs if there were any, and the flashing details most people never get to see from the ground. If a question comes up, that's when it gets answered, while we're standing right there.

How long the whole thing takes depends on your roof — its size, how steep it is, how many layers come off, and the material going back on. We'll give you a straight timeline for your house before work starts, and if weather moves a day, we'll tell you that too instead of leaving you guessing.

We've done more than 2,000 roofs across Middle Tennessee over 15-plus years, and the process above doesn't change: tear it down to the truth, fix what's under it, build the system right, and clean up like it was our own yard. That's what a replacement is supposed to look like.

FAQ

Do I need to leave my house during a replacement?

Most homeowners stay home. Just know it will be loud while the tear-off and installation are going on, and plan to keep kids and pets inside and away from the work area. If you've got a home office, a heads-up that replacement day is not a quiet Zoom day is fair warning.

What should I do to get ready?

Move vehicles out of the driveway so the trailer and crew can work, get patio furniture and grills clear of the roofline, and take fragile pictures off the walls — the work vibrates the house more than people expect. We'll go over the full list with you before the day comes.

Why not just roof over the old shingles and save money?

Because it hides the one thing you most need to see: the deck. A layer-over can trap problems, adds weight, and usually doesn't last as long. Tearing off costs a little more up front and tells you the truth about your roof. In our book, that's the money well spent.

Thinking about a replacement? Start with the free inspection

You don't have to commit to a new roof to find out where yours stands. Call 615-801-0959 for a free inspection and a flat-rate estimate. We'll check the roof and the attic, show you the photos, and tell you straight whether you're looking at a repair, a replacement, or a roof with years left in it. Need it faster? We do virtual estimates within 24 hours. Rex Roofing & Construction serves Williamson, Davidson, Dickson, Hickman, Cheatham, Rutherford, and Maury counties.